Residents news and updates

  • Home
    Home This is where you can find all the blog posts throughout the site.
  • Categories
    Categories Displays a list of categories from this blog.

Interruption to Building Water Supply

Posted by on in Uncategorised
  • Font size: Larger Smaller
  • Hits: 641
  • Print

Following the recent discovery of a substantial leak in the Core 2 vertical water mains pipework, it will regrettably today be necessary to completely turn off the building water supply for a minimum of several hours whilst the damaged section is fixed.

Whereas the actual repair should in itself not take long to complete, the very nature of our high rise building will necessitate substantial associated works such as safely isolating the six booster pumps, draining off all excess water within the Core 2 pipes and fully replenishing the large water storage tanks prior to turning the supply back on.

The work has been scheduled to commence as at 10:00am and it is hoped that the water supply to all apartments will be back to normal within about three or four hours later.

We would apologise for the inevitable inconvenience to some residents, but we have been assured that the total isolation of the water supply represents the only feasible way that the problem can be adequately resolved.


From the Board of Directors at Landmark Place.

Our Location